Neišsiliejančio aušinimo skysčio piltuvo rinkinys (VS0043) (Kodas: VS0043)
Prekių nuotraukos skirtos tik iliustraciniams tikslams, originalių produktų spalvos, užrašai, parametrai, matmenys, dydžiai, funkcijos, ir/ar bet kurios kitos savybės dėl savo vizualinių ypatybių gali atrodyti kitaip negu realybėje, todėl prašome vadovautis prekių savybėmis, kurios nurodytos prekių aprašymuose. Kilus klausimams, visada laukiame Jūsų skambučio telefonu +370 650 61061 arba el. paštu info@drdtools.lt.
Gamintojas: Essen tools
Universal set for easy, efficient and mess free refilling during cooling system bleeding work
Includes five rubber seal adaptors (31, 35, 40, 42, 45mm) to suit most vehicles
Also includes one rubber tapered cone adaptor for variable applications and multi-purpose use
Enables vehicle coolant filler point to be raised, assisting with coolant system bleeding and removal of air pockets common in modern passenger vehicle applications
8 piece set
Step 1: Choose an adaptor to fit the expansion tank or radiator opening
Step 2: Apply the suitable adaptor and fit the screw body on to it and tighten to obtain a seal
Step 3: Fit the funnel to the tightened screw body
Step 4: Fill the funnel with coolant (you will notice air is bled out via the by-pass tube)
Step 5: Once the cooling system is full, the flow from the funnel can be switched off to avoid coolant spillage
Includes five rubber seal adaptors (31, 35, 40, 42, 45mm) to suit most vehicles
Also includes one rubber tapered cone adaptor for variable applications and multi-purpose use
Enables vehicle coolant filler point to be raised, assisting with coolant system bleeding and removal of air pockets common in modern passenger vehicle applications
8 piece set
Step 1: Choose an adaptor to fit the expansion tank or radiator opening
Step 2: Apply the suitable adaptor and fit the screw body on to it and tighten to obtain a seal
Step 3: Fit the funnel to the tightened screw body
Step 4: Fill the funnel with coolant (you will notice air is bled out via the by-pass tube)
Step 5: Once the cooling system is full, the flow from the funnel can be switched off to avoid coolant spillage